This section is about major industrial investments and power purchase agreements (PPAs), that are based on renewable energy. This page is still a draft, it is far from beeing complete and will be officially launched in Q2/2015.

Company: IKEA

Renewable energy: Wind

Plant location: Cameron County, Texas, USA

Size: 165 MW

Company: Amazon

Renewable energy: Wind

Plant location: Benton County, Indiana, USA

Size: 150 MW

Company: Facebook

Renewable energy: Wind

Plant location: Grundy County, Iowa, USA

Size: 138 MW

Company: Apple

Renewable energy: Solar

Plant location: Monterey County, California, USA

Size: 130 MW

Company: Microsoft

Renewable energy: Wind

Plant location: Jacksboro, Texas, USA

Size: 110 MW

Company: Google

Renewable energy: Solar

Plant location: Red Hills, Utah, USA

Size: 104 MW

Company: Facebook

Renewable energy: Solar

Plant location: Prineville, Oregon, USA

Size: 100 MW

Company: University of California

Renewable energy: Solar

Plant location: Fresno County, California, USA

Size: 80 MW

Company: Yahoo

Renewable energy: Wind

Plant location: Rush County, Kansas, USA

Size: 25 MW

Please follow us on TWITTER

THEnergy is presenting at the Energy and Mines World Congress. Get 20% discount with the discount code "thenergy20".

Thu

09

Jul

2020

Top 5 Microgrid News – H1/2020 by THEnergy

The new edition of our “Top 5 Microgrid News” features microgrids on islands, at office and university buildings and small community. It covers projects in the United Emirates, USA, UK, and Switzerland. It features Nurai Island Resort, Enerwhere, Isle au Haut Electric Power Company, Kilowatt Labs, Electricity Works Walenstadt, Swansea University, Redflow, EDF, and PowerFlex.

Read More

Thu

23

Jan

2020

Bye-bye dirty diesel gensets for remote mines

THEnergy-Triogen report analyses how remote microgrids can be optimized by efficiency improvements of diesel gensets

Read More

Dr. Thomas Hillig Energy Consulting
Pestalozzistr. 40b
D-80469 München

info @ th-energy.net
Tel.: +49-152-36186442